Clean room Design consultation.
1. Clean room factory and workshop renovation graphic design.
2. Total Laboratory graphic design (including microbial limit test lab, sterility lab design).
3. Clean room sampling graphic design.
Clean room GMP management main point(Clean room Design and operation management).
1. Clean room can not use inflammabl1e thermal insulation material.
2. The design of Clean room consider management and monitoring staff entering clean room unnecessarily.
3. Clean room can not have position difficult to be cleaned.
4. Pool, floor drain, downstream (dewatering) system design and use requirement(layout and maintaining requirement): prevent pollution and cross contamination.
5. Clean room Laundry gallery GMP requirement.
6. Air-Condition various parameters implementing pre-warning system.